MASTERIMPACT®-RH chosen to ensure noise absorption and stability to the humid Alex Jany sports complex.
The pool of the complex Alex Jany in Toulouse is naturally a building with very high humidity, according to EC CSTB classification. The request of the head contractor was to make a bulkhead against concrete, separating pools and locker rooms, and being able to counteract the noise. The board MASTERIMPACT®-RH was chosen for its excellent resistance to moisture and splash water. A study conducted by Promat on techniques to lower the noise effects resulted in 300m² of MASTERIMPACT®-RH boards, covering the walls from floor to ceiling.