An Olympic multipurpose hall for handball, basketball, volley ball, badminton, rhythmic gymnastics and international ice rink sports, compliant with local and international federation standards. The project consists of three buildings (the main arena building, the TV building and cooling tower building) as well as two storm water tanks located underground, and site landscaping (soft- and hard-scape) and internal roads around the buildings.
The building has 1 basement and 4 floors above ground plus catwalk floors with a free height of 34m and free span opening of 105m. The building comprises 45,200 m³ concrete and 2,300 tons of steel structure at the roof level.
The Main Arena Building is on a plot of approximately 16,000 m² and consists of a fully-integrated air-conditioned Main Field of Play courts for Basketball, Volleyball, Handball, Badminton and Rhythmic Gymnastics, with seating for 8,524 spectators, and with all relevant supporting facilities and spaces.