Expert Area

Learn from our technical experts and researchers about the perfect way to build a Passive Fire Protection solution. Discover in-depth articles about fire safety engineering, our testing methods and innovative products that will change the way we build.

PROMATECT-H® protects open air car park at Zurich airport
8/30/2023
PROMATECT-H® protects open air car park at Zurich airport
When Zurich Airport decided to renovate its impressive open air car park, it looked for a future-proof solution to protect its steel load-bearing structure against fire. A protection with PROMATECT-H® boards was chosen to guarantee 30 years of structural fire safety.
Promat successfully tests a giant wall of PROMATECT®-100X
12/6/2022
Promat successfully tests a giant wall of PROMATECT®-100X
Promat successfully tested one of the highest compartmentation walls in the world, built with PROMATECT®-100X boards. Our fire protection board was used to build a giant wall in one of the highest furnaces available in Europe.
News from Australia
12/22/2021
News from Australia
The Sydney Metro have chosen Over Track Exhaust Ducts as opposed to concrete structures.
News from Poland
10/27/2021
News from Poland
In 2016 the Tunnel team started to support colleagues in Poland during initial talks to supply PROMATECT® boards for a new tunnel South of Poland - Rabka Zdroj – situated 60km from Krakow - a part of S7 Expressway in direction to Zakopane (Polish biggest mountain resort town).
News from Poland
10/25/2021
News from Poland
We are proud to collaborate in the realization of the construction of the Łagiewnicka Route, part of the Kraków inner southern bypass.
PROMATECT-H boards will survive earthquake and fire
9/24/2021
PROMATECT-H boards will survive earthquake and fire
Promat has a mission to protect people and buildings against fire, whatever the cause. This is why we contributed to the unique EQUFIRE project to test if our PROMATECT-H board will maintain its fire protection capabilities after several severe earthquakes. The results were spectacular.
News from The Netherlands
5/12/2021
News from The Netherlands
For the Michiel de Ruijtertunnel in Amsterdam Etex Building Performance - Promat supplies fire protection boards.
News from Asia
4/28/2021
News from Asia
This tunnel is the longest underwater tunnel in China at 11km long under the Taihu lake with 550,000m2 of concrete to be protected.

Promat Technical Support

Contact our technical support team with your questions on passive fire protection solutions, our products and systems or installation advice...

Technical Documentation

Find the product datasheets, system brochures, Declarations of Performance, installation manuals and other documents you need to get the job done.