Situated in the heart of Jakarta, the RDK Haryono Data Centre is a modern, 14-storey facility meticulously designed to maximize functionality within a limited footprint, addressing the expanding data needs of Indonesia’s capital. To ensure the highest fire safety standards, the project required a robust 2-hour fire-rated cladding duct system that effectively prevents the spread of flames through ducts and cable ducts, safeguarding critical infrastructure within the facility.
Applications
Promat’s fire protection solutions used for this data center:
SUPALUX® Fire-Rated Board: Installed to construct a reliable, 2-hour fire-rated cladding duct system, SUPALUX® provides essential integrity-only fire protection, preventing the spread of flames through pipes and cable ducts across the facility.
PROMATECT®-H Fire-Rated Board: These high-performance boards were used to build a ceiling membrance system, enclosing the open area to compartmentalise spaces effectively and bolster passive fire safety throughout the structure.
Other Key Project Participants
Lead Consultant: RED Engineering
Architect: AWP Architects
Main Contractor: PT. Berca Buana Sakti
MEP Contractors: PT. Rubi Eakon Indonesia; PT. Bintang Timur Anugrah; PT. Era Cakrawala Indonesia
Applicator: PT. Trimitra Bangun Selaras
With the installation of Promat’s SUPALUX® and PROMATECT®-H, the RDK Haryono Data Centre is now equipped with a resilient passive fire protection system, critical to maintaining operational safety in Jakarta's digital infrastructure landscape. Promat is proud to contribute to this innovative facility, providing peace of mind with dependable, high-performance passive fire protection solutions.