The construction of Data Centre 2 in the Karawang area is led by Bank Indonesia. The project is estimated to be worth approximately IDR170 billion and is intended to strengthen the data centre infrastructure, reflecting its strategic importance. To meet the highest fire safety standards, the project utilised a 2-hour fire-rated DURASTEEL® partition wall, standing up to 8.8 meters high and covering 332.5 sqm as a fire barrier for the Data Hall area.
Applications
DURASTEEL® composite board 9.5mm thick, was utilised to construct a fire-rated partition wall with a height of up to 8.8 metres, covering an area of 332.5 sqft. This high-performance solution delivers robust fire protection while offering resistance to high impacts and blasts, ensuring the structure's integrity and safety in critical conditions.
Other Key Project Participants
Lead Design Consultant: INDOKOEI INDONESIA
Design Consultant: AURECON INDONESIA, ANGGARA ARCHITEAM, AIRMAS ASRI
QS Consultant: TEAMWORX INDONESIA
Main Contractor: PT. ADHI KARYA – JAYA TEKNIK INDONESIA
Distributor: PT. BERSAMA BANGUN PERSADA
Applicator: PT. BERSAMA BANGUN KARYA
This project showcases the collective expertise of industry professionals in creating advanced infrastructure that meets the needs of data centres, with a focus on fire safety to protect life and valuable assets. By installing DURASTEEL®, the facility now benefits from a durable fire-rated and blast-resistant partition wall, essential for maintaining structural integrity in high-risk environments, and Promat is proud to be a part of this solution, ensuring safety and reliability in the face of potential fire and blast challenges.