The Cingleot Premium Logistics Centre will be one of the largest and most technologically advanced facilities of its kind in the region. This project is part of a massive CNY100 billion (CAD19.8 billion) global investment by the Alibaba Group to develop its global logistics network.
Applications
They utilized PROMATECT®-H 15mm board for cladding around sheet metal duct forming the smoke extraction ductwork system. This high-performance solution ensured the safety and efficiency of the smoke extraction system to achieve an impressive FRR rating of 120/120/120, providing a robust fire-resistant solution to protect the logistics center and its occupants. As experts in the field, we showcased our commitment to safety excellence.
Related products
PROMATECT®-H -a non combustible matrix engineered mineral board
Other Key Project Participants
Architect: Aedas
Main Contractor: Able Engineering Holdings Limited & Build King Holdings Limited (Joint Venture)